Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the disable-comments domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/webvol20/lw/t5gkgs5y64l89d6/coning.se/public_html/wp-includes/functions.php on line 6114
Pressure vessels and pipelines – CONING project AB

We represent producers of complete pressure vessels and different pressure equipment.

Manufacturers are authorized to produce of complete producs. Design, production, inspection and documentation follows the rules prescribed in the PED 97/23 / EC (AFS 1999: 4), 2014/68/EC (AFS 2016:1) and the respective Swedish standard. We engage a third party (internationally accredited inspection bodies) for monitoring and approving the production process in its various stages. Products with the requirements for CE marking are accompanied by the document “Declaration of Conformity”.


For more information on quality, see the link “quality and documentation” in the menu on right side.